I. Introduction
In order to lower total costs, prime contractors often solicit estimates for part of their work from potential subcontractors who can perform that work on their behalf with lower costs, prior to submitting their own estimates in procurement auctions. In this situation, the subcontractors behave as if they were bidding for the subcontract work in auctions conducted by the prime contractors. [3] presented a theoretical model for capturing this aspect of procurement auctions as simply as possible and considered the strategic behavior of subcontractors in the model, assuming that subcontractors are risk-neutral.