Loading [MathJax]/extensions/MathMenu.js
Agile-Based Requirement Challenges of Government Outsourcing Project: A Case Study | IEEE Conference Publication | IEEE Xplore

Agile-Based Requirement Challenges of Government Outsourcing Project: A Case Study


Abstract:

In 2019, one of the government organizations in Indonesia conducted several agile-based system development projects outsourced. However, some of the projects claimed to b...Show More

Abstract:

In 2019, one of the government organizations in Indonesia conducted several agile-based system development projects outsourced. However, some of the projects claimed to be failed regarding requirement issues. For government projects, this failure became a state loss. This research aims to analyze the practical requirements issue or problem in the failed project from an agile perspective, to avoid the same loss in the future. A systematic literature review conducted and matched with official documents, direct observation and correspondence, results in the identification of 25 factors grouped into 7 categories. The findings show that requirement changing, over-scooping, and communication become the main challenges in the case study. Agile best practice solutions were offered for each factor and challenge, along with a comparison view between the provider and government organization. Although these findings cannot be claimed generally, it can contribute as the requirement issues to beware and mitigated in an agile-based government outsourcing project.
Date of Conference: 15-16 September 2020
Date Added to IEEE Xplore: 04 December 2020
ISBN Information:
Conference Location: Yogyakarta, Indonesia

Contact IEEE to Subscribe

References

References is not available for this document.