Accelerated reliability testing for telecommunication systems using the highly accelerated life test (HALT) and highly accelerated stress screening (HASS) | IEEE Conference Publication | IEEE Xplore

Accelerated reliability testing for telecommunication systems using the highly accelerated life test (HALT) and highly accelerated stress screening (HASS)


Abstract:

A new method that can improve equipment reliability during the design process and increase process reliability in production environments is presented. HALT is a method f...Show More

Abstract:

A new method that can improve equipment reliability during the design process and increase process reliability in production environments is presented. HALT is a method for assessing and increasing the robustness of products during development. A HASS procedure is derived from the data obtained from the HALT investigation and used to track down process weaknesses and process failures in production environments. Following the realisation of HALT and HASS is described and the results obtained from a test are presented. Furthermore, the strengths and weaknesses of the methods are outlined from a users point of view.
Date of Conference: 10-10 May 2000
Date Added to IEEE Xplore: 06 August 2002
Print ISBN:3-8007-2546-0
Conference Location: Dresden, Germany

Contact IEEE to Subscribe

References

References is not available for this document.