Loading [MathJax]/extensions/MathMenu.js
Substation Commissioning and Turnover Planning | IEEE Journals & Magazine | IEEE Xplore

Substation Commissioning and Turnover Planning

Open Access

Abstract:

Planning for the commissioning of an industrial substation can be one of the most challenging jobs facing an electrical engineer today. The goal of any commissioning effo...Show More

Abstract:

Planning for the commissioning of an industrial substation can be one of the most challenging jobs facing an electrical engineer today. The goal of any commissioning effort is to energize the equipment safely, in the time frame dictated by construction completion and process startup plans, while fulfilling all of the OSHA requirements. Of course, this must happen in a cost-effective manner. With the new equipment available and de-energized, and testing and manufacturer’s experts available, several additional opportunities present themselves. The commissioning window is an ideal time to train the site electricians and process technicians on the electrical system and establish baseline maintenance data for future trending of preventative and predictive maintenance.
Published in: IEEE Industry Applications Magazine ( Volume: 6, Issue: 2, March-April 2000)
Page(s): 8 - 22
Date of Publication: 30 April 2000

ISSN Information:


References

References is not available for this document.