Abstract:
In the initial phase of restoration, operators are often concerned with the size of load which can safely be picked-up, and the effectiveness of the generation reserve. T...Show MoreMetadata
Abstract:
In the initial phase of restoration, operators are often concerned with the size of load which can safely be picked-up, and the effectiveness of the generation reserve. There has been a need for a methodology to readily address these concerns by providing simple guidelines to facilitate an orderly power system restoration. In this paper, a simple approach is developed based on an approximate frequency response rate of prime movers for determining: (a) the maximum load pickup within the allowable system frequency dip, and (b) the amount and distribution of reserve for maintaining firm generation.
Published in: IEEE Transactions on Power Systems ( Volume: 14, Issue: 2, May 1999)