Abstract:
In this paper a discrete-continuous project scheduling problem with discounted cash flows is considered. Each activity requires for its processing discrete resources and ...Show MoreMetadata
Abstract:
In this paper a discrete-continuous project scheduling problem with discounted cash flows is considered. Each activity requires for its processing discrete resources and an amount of a continuous resource. Processing rate of an activity is a concave function of the amount of the continuous resource allotted to this activity at a time. A positive cash flow is associated with the completion of each activity. The objective is the maximization of the net present value of all cash flows of the project. Two heuristics for allocating the continuous resource are proposed, and compared to optimum on a basis of a computational experiment. Some conclusions as well as directions for future research are given.
Published in: 2016 21st International Conference on Methods and Models in Automation and Robotics (MMAR)
Date of Conference: 29 August 2016 - 01 September 2016
Date Added to IEEE Xplore: 26 September 2016
ISBN Information:
Keywords assist with retrieval of results and provide a means to discovering other relevant content. Learn more.
- IEEE Keywords
- Index Terms
- Cash Flow ,
- Discounted Cash Flow ,
- Project Scheduling Problem ,
- Complete Activities ,
- Concave Function ,
- Net Present Value ,
- Activity Time ,
- Renewable Sources ,
- Combined Action ,
- Active Part ,
- Nonlinear Programming ,
- Actual Size ,
- Optimal Allocation ,
- Problem Size ,
- Mathematical Problem ,
- CPU Time ,
- Resource Units ,
- Nonlinear Programming Problem ,
- Local Search Algorithm ,
- Average Relative Deviation ,
- Precedence Constraints ,
- Feasible Schedule ,
- Unique Root ,
- Precedence Relations
- Author Keywords
Keywords assist with retrieval of results and provide a means to discovering other relevant content. Learn more.
- IEEE Keywords
- Index Terms
- Cash Flow ,
- Discounted Cash Flow ,
- Project Scheduling Problem ,
- Complete Activities ,
- Concave Function ,
- Net Present Value ,
- Activity Time ,
- Renewable Sources ,
- Combined Action ,
- Active Part ,
- Nonlinear Programming ,
- Actual Size ,
- Optimal Allocation ,
- Problem Size ,
- Mathematical Problem ,
- CPU Time ,
- Resource Units ,
- Nonlinear Programming Problem ,
- Local Search Algorithm ,
- Average Relative Deviation ,
- Precedence Constraints ,
- Feasible Schedule ,
- Unique Root ,
- Precedence Relations