Abstract:
An IEC61850 based Standardised Substation Protection and Control (P&C) System demonstrates significant construction and operational advantages over conventional P&C norma...Show MoreMetadata
Abstract:
An IEC61850 based Standardised Substation Protection and Control (P&C) System demonstrates significant construction and operational advantages over conventional P&C normally used in transmission substations. Utilities face big challenges in updating their transmission network, such as lifecycle coordination between primary plant and secondary systems and the complex wiring associated with connecting them together. These problems can be solved by strictly adhering to the IEC61850 standards and realizing options such as interoperability and “plug & play” swapping of devices. This project set up a flexible protection and control proof of concept laboratory that represents the protection schemes used in a UK 400kV substation to assess the performance of IEC 61850 on the P&C scheme before being applied to a real transmission substation. The paper will discuss the compatibility between conventional hardwired relay and IEC61850 Intelligent Electronic Devices (IEDs), the communication between Merging Unit and IEDs through Fibre Optic Communications, the relay test set and testing software. Utilities seek to gain confidence in the system so that when it is rolled out to a real substation it will perform as expected, and the engineers involved in the roll-out are confident in the use of IEC61850 technology.
Published in: 12th IET International Conference on Developments in Power System Protection (DPSP 2014)
Date of Conference: 31 March 2014 - 03 April 2014
Date Added to IEEE Xplore: 31 July 2014
Print ISBN:978-1-84919-834-9