Abstract:
This paper discusses the steps key to successful installation of complex seafloor communication, power and sensor networks. Emphasis on a systems engineering approach to ...Show MoreMetadata
Abstract:
This paper discusses the steps key to successful installation of complex seafloor communication, power and sensor networks. Emphasis on a systems engineering approach to design, development and deployment requiring the coordination of a diverse team of optical fiber specialists, marine cable engineers, technicians, deck hands, riggers, ROV operators, ship's crew and officers is essential to safely and efficiently install these systems at thousands of meters of ocean depth. This is illustrated through the detailed description of a system recently installed in the Eastern Mediterranean Sea. CSnet's Offshore Communication Backbone (OCB) will initially serve as the Tsunami Warning and Early Response system of Cyprus (TWERC). Nascent hydrocarbon exploration has also recently begun in this region. As this activity increases, leading to drilling and production, this OCB will similarly be expanded. In a phased approach, the TWERC will be extended to also service this offshore energy enterprise, supporting environmental and well monitoring sensors and providing two way broadband communications and power from seafloor to shore. The initial installation was completed in two preliminary phases. The first phase utilized two vessels (a cable ship and a DP II support ship), each equipped with remotely operated vehicles (ROVs), to lay a total of 255 km of cable, five seafloor nodes, an anchor interface and a seawater ground anode. Both multi-beam and visual (ROV) pre-deployment seafloor surveys of each node (junction box) site was performed. Installing each node, connectivity was maintained (power and communications) with the deployment vessel enabling its functionality to be continuously monitored while being lowered through the water column and after its touchdown on the seafloor. The second phase of this OCB installation deployed a moored buoy that provides both power and communication to the TWERC, in advance of any eventual shore-ended cable and power station and the attendant...
Published in: OCEANS'11 MTS/IEEE KONA
Date of Conference: 19-22 September 2011
Date Added to IEEE Xplore: 19 December 2011
ISBN Information:
Print ISSN: 0197-7385