Abstract:
In dairy filling and packing lines, due to line unbalance, extra time is required for the upstream filling station with lower production rate to work in advance to build ...Show MoreMetadata
Abstract:
In dairy filling and packing lines, due to line unbalance, extra time is required for the upstream filling station with lower production rate to work in advance to build work-in-process so that the downstream packing station can operate at a higher productivity during a shift to achieve the desired production volume. In this paper, we present a study of transient analysis in such lines. We evaluate the system production rate and work-in-process during transients, the necessary extra time of the filling station, the system operating time, and the blockage and starvation of the filling and packing stations, respectively, for different buffer capacities. In addition, we investigate the impacts of filling station efficiency and initial inventory on system performance.
Published in: Proceedings of the 2010 American Control Conference
Date of Conference: 30 June 2010 - 02 July 2010
Date Added to IEEE Xplore: 29 July 2010
ISBN Information: