Loading [MathJax]/extensions/MathMenu.js
A heuristic approach for scheduling multi-chip packages for semiconductor backend assembly | IEEE Conference Publication | IEEE Xplore

A heuristic approach for scheduling multi-chip packages for semiconductor backend assembly


Abstract:

The processes in which the multi-chip packages (MCP) positions the multiple dies to one lead frame pose great challenges to production scheduling in the semiconductor bac...Show More

Abstract:

The processes in which the multi-chip packages (MCP) positions the multiple dies to one lead frame pose great challenges to production scheduling in the semiconductor backend assembly environment. A MCP scheduling problem is also called the multi-pass scheduling problem, as multiple passes are carried out on the same operation sequentially. Such a scheduling problem does not belong to any of the conventional scheduling categories and its constraints are much more complex to tackle. This paper describes a practical realization of a heuristics approach for scheduling MCP problem. The enhanced daily production scheduling (DPS) engine is capable of modeling the real production constraints, resulting in a more realistic and practical schedule which can be followed closely by the production supervisors, eliminating the ad-hoc and error-prone manual practices.
Date of Conference: 25-28 September 2007
Date Added to IEEE Xplore: 04 January 2008
ISBN Information:

ISSN Information:

Conference Location: Patras, Greece
Singapore Institute of Manufacturing Technology, Singapore
Singapore Institute of Manufacturing Technology, Singapore
Dimension Systems Private Limited, Singapore

Singapore Institute of Manufacturing Technology, Singapore
Singapore Institute of Manufacturing Technology, Singapore
Dimension Systems Private Limited, Singapore
Contact IEEE to Subscribe

References

References is not available for this document.