Abstract:
The continuous gas-lift method is one of the most used artificial lifting techniques in which the allocation of gas injection rates is a very important optimization probl...Show MoreMetadata
Abstract:
The continuous gas-lift method is one of the most used artificial lifting techniques in which the allocation of gas injection rates is a very important optimization problem. In this work, we develop a dynamic programming (DP) algorithm that solves the profit maximization problem for a cluster of oil wells producing via gas lift, with multiple well performance curves (WPCs) and constrained by the amount of lift gas available for injection. The algorithm is a low-cost and high-efficiency decision support tool that outperforms alternative methods found in the literature.
Published in: IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans ( Volume: 36, Issue: 2, March 2006)
Graduate Program in Electrical Engineering, Federal University of Santa Catarina, Florianópolis, Brazil
Department of Automation and Systems, Federal University of Santa Catarina, Florianópolis, Brazil
Graduate Program in Electrical Engineering, Federal University of Santa Catarina, Florianópolis, Brazil
Department of Automation and Systems, Federal University of Santa Catarina, Florianópolis, Brazil