Loading [a11y]/accessibility-menu.js
Multiproject staff scheduling with variable resource constraints | IEEE Journals & Magazine | IEEE Xplore

Multiproject staff scheduling with variable resource constraints


Abstract:

An analytical approach and a PC software based solution are presented to a project management problem, in which multiple resources must be allocated to perform both routi...Show More

Abstract:

An analytical approach and a PC software based solution are presented to a project management problem, in which multiple resources must be allocated to perform both routine tasks and a set of projects with varying levels of priority. The performance of a priority-based decision rule was tested on this project management problem. The model was able to provide division-level management with an effective tool for staff workload planning and program management. A sequential, iterative approach is developed and used to test and evaluate alternative PC commercial software on a set of projects and evolving criteria. A PC commercial software package, with associated heuristics, is demonstrated to provide useful results to multiproject staff scheduling problems in an actual organization.<>
Published in: IEEE Transactions on Engineering Management ( Volume: 39, Issue: 1, February 1992)
Page(s): 59 - 72
Date of Publication: 29 February 1992

ISSN Information:


Contact IEEE to Subscribe

References

References is not available for this document.