Timing Synchronization Framework for Wide Area Measurement System in Smart Grid Computing | IEEE Conference Publication | IEEE Xplore

Timing Synchronization Framework for Wide Area Measurement System in Smart Grid Computing


Abstract:

The exceptionally designed correspondence is currently on-request in the force business mainly for the control, estimation, and checking frameworks in electrical substati...Show More

Abstract:

The exceptionally designed correspondence is currently on-request in the force business mainly for the control, estimation, and checking frameworks in electrical substations that are profoundly essential to have high accessibility, precise, and continuous observing frameworks. The conventional substations are equipped with Programmable Logic Controllers (PLCs) with the Supervisory Control and Data Acquisition (SCADA) frameworks. These PLCs operate the smart grid substations' data as a communication channel by covering a regulated carrier frequency of the overhead transmission lines. Existing PLCs with SCADA and Phasor Measurement Unit (PMU) with the IEEE C37.118 based WAM framework faces synchronization difficulties in estimating real-time phasors and controlling of Wide Area Measurement System (WAMS) in the smart grid network. Along these lines, this article aims to build up a precise synchronization framework for two-way correspondence in the smart grid network. The key objective is to relieve the stage counterbalanced and mitigate delay errors to monitor the grids through PMUs based WAMS continuously. The simulation result suggests that the proposed framework archives better precision than the existing IEEE C37.118.
Date of Conference: 06-08 October 2020
Date Added to IEEE Xplore: 07 April 2021
ISBN Information:
Conference Location: Malaga, Spain

Contact IEEE to Subscribe

References

References is not available for this document.