Abstract:

The increasing penetration of variable and uncertain generation from renewable resources poses a challenge for balancing the power system supply and demand. Violations of...Show More

Abstract:

The increasing penetration of variable and uncertain generation from renewable resources poses a challenge for balancing the power system supply and demand. Violations of this constraint seriously impact system reliability and thus carry with them a very high cost. In order to address the issues created by variable generation increased system flexibility is required. System operators are considering modifications to the conventional real-time economic dispatch model to provide improved ramp flexibility. In this paper an operational flexibility metric called lack of ramp probability (LORP) is proposed for the real-time economic dispatch. Further, a two-step robust optimization based framework is introduced to simultaneously guarantee LORP flexibility metric and ensure ramp deliverability in a multi-zonal setting. The proposed framework is illustrated on a 3-zone modified IEEE 73 bus (RTS-96) test system.
Published in: IEEE Transactions on Power Systems ( Volume: 31, Issue: 5, September 2016)
Page(s): 3437 - 3446
Date of Publication: 10 November 2015

ISSN Information:

Funding Agency:


1. Nomenclature

Index of all buses in the network.

Index of all zones in the network.

Index of all dispatchable generators.

Index of all loads.

Index of all inter-zonal tie-lines.

Index of all intra-zonal transmission lines.

Index of real time dispatch (5 min. intervals).