Discussion on “design, construction and tests of an artificial transmission line”, “protection of electrical transmission lines”, “tests of grounded phase protector on the 40,000-volt system of the southern power co.,” “tests of losses on high tension lines.” Schenectady, February 14, 1911. (see proceedings for January and March, 1911) | IEEE Journals & Magazine | IEEE Xplore