Abstract:
When using an availability centered plan, a design develops that most appropriately matches the requirements of the facility, maximizing the effectiveness of resources. A...Show MoreMetadata
Abstract:
When using an availability centered plan, a design develops that most appropriately matches the requirements of the facility, maximizing the effectiveness of resources. An availability centered plan serves to recognize subsystems that have specialized needs - needs that are unique from the remainder of the facility. In so doing, resources can be applied only where necessary, helping to optimize and prioritize the designs.
Date of Conference: 06-11 May 2007
Date Added to IEEE Xplore: 20 August 2007
ISBN Information: