Loading [MathJax]/extensions/MathMenu.js
Scheduling and rescheduling with iterative repair | IEEE Journals & Magazine | IEEE Xplore

Scheduling and rescheduling with iterative repair


Abstract:

The GERRY scheduling and rescheduling system being applied to coordinate Space Shuttle ground processing is described. The system uses constraint-based iterative repair, ...Show More

Abstract:

The GERRY scheduling and rescheduling system being applied to coordinate Space Shuttle ground processing is described. The system uses constraint-based iterative repair, a technique that starts with a complete but possibly flawed schedule and iteratively improves it by using constraint knowledge within repair heuristics. The tradeoff between the informedness and the computational cost of several repair heuristics is explored. It is shown empirically that some knowledge can greatly improve the convergence speed of a repair-based system, but that too much knowledge can overwhelm a system and result in degraded performance.<>
Published in: IEEE Transactions on Systems, Man, and Cybernetics ( Volume: 23, Issue: 6, Nov.-Dec. 1993)
Page(s): 1588 - 1596
Date of Publication: 31 December 1993

ISSN Information:


Contact IEEE to Subscribe

References

References is not available for this document.