By Topic

1035-1989  -  IEEE Recommended Practice: Test Procedure for Utility-Interconnected Static Power Converters

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$45.0 $37.0
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

The following topics were dealt with: This test procedure is a recommended practice for testing utility-interconnected static power converters. The test procedure applies to single- and three-phase units rated from 1 kW to 500 kW and may also be applied in principle to larger units. The objective of this test procedure is the measurement of electrical parameters at the AC terminals of the power converter. The test procedure may serve as a basis for factory or acceptance testing. It focuses on equipment that lends itself to mass production and is readily interconnected to an electric utility, rather than on equipment subject to site-specific design and testing. Test results may be used in evaluating or comparing different types of static power converters.<>