By Topic

Analysis and simulation of passenger flows in an airport terminal

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Gatersleben, M.R. ; Logistics Competence Centre, Schiphol, Netherlands ; Van der Weij, S.W.

As human behavior is often thought to be hard to define in models, simulations of processes with people involved are less common than industrial simulations. Nevertheless simulation has been very valuable in passenger logistics to study bottlenecks and test potential solutions. This paper describes a project concerning the analysis and redesign of passenger handling at an airport, in which dynamic modeling played an important role. Simulation has been applied here to gain insights into the relations between the distinguished processes, the presence of bottlenecks and their causes. With the simulation models future situations were represented, through which long-term expectations can be posted. In this way critical aspects in the passenger flow through the airport terminal have been explored and studied. All potential bottlenecks have to be suppressed by apt arrangements. These can consist of an expansion of the availability of resources or floor space, but many times improving the processes can be a more effective or more efficient solution. Several supposed measurements have been tested in a quantitative way, to examine whether they fulfill the expectations, are robust and do not create new problems. The overview of bottlenecks and the comparison of measurements formed the required results of the simulation project. As detailed simulation studies require exact descriptions of processes and representative data, a large amount of information had to be collected and laid down. Process control and management will take advantage of it

Published in:

Simulation Conference Proceedings, 1999 Winter  (Volume:2 )

Date of Conference:

1999