Circuit-breaker requirements for alternative configurations of a 500 kV transmission system

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

5 Author(s)
Esmeraldo, P.C.V. ; Furnas-Centrais Electr. S.A., Brazil ; Amon F, J. ; Carvalho, F. ; Carvalho, A.C.C.
more authors

This paper describes a study made to assess the electrical stresses imposed on line circuit breakers of a new 500 kV AC expansion of the FURNAS transmission system, to be possibly installed in the Brazilian central region. The study has considered three configurations of the transmission lines, two of which assume the use of compact towers. In one of these two cases, the lines would have high surge-impedance loading. Digital simulations have been made with the aid of the Alternative Transients Program (ATP) to calculate the switching transients appearing as a result of line energization and reclosing, clearing of terminal and short-line faults, no-load line opening in normal and faulted conditions and out-of phase switching. Four alternatives have been considered for the limitation of overvoltages on closing, assuming either the sole use of surge arresters on each line end or the use, in addition to the arresters, of pre-insertion resistors, synchronizers or time relays to provide a staggered closing of the breaker poles. The stresses obtained were compared with those applied by the standard IEC tests or with the maximum admissible levels usually considered by the utility for its transmission branches at the planning stage

Published in:
Power Delivery, IEEE Transactions on  (Volume:14 ,  Issue: 1 )

Date of Publication: Jan 1999

Need Help?


IEEE Advancing Technology for Humanity About IEEE Xplore | Contact | Help | Terms of Use | Nondiscrimination Policy | Site Map | Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest professional association for the advancement of technology.
© Copyright 2013 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.