By Topic

Field pole spares bid for tenders specification guide for salient pole hydro generators

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

1 Author(s)
Thomasset, P.J. ; Gabriel Terra Hydro Power Plant, Paso de los Toros, Uruguay

Every time stator winding maintenance is to be done, hydro generator field poles are parts that are taken out/in on the rotor rim, being a high risk operation, as the field pole are a fragile piece of the generator, risking a pole damage. Repair a damaged field pole can take take months if the damage is a mayor one, and has to be done overseas at foreign contractor workshops, so to have spare parts pole pieces ready to fit in the rotor rim is a must. Currently there are no standard guide or papers support for writing a bid for tenders to buy new spares field poles. This papers as a guide, joins what was gotten in periodical papers, standards and manufactures brochures, to have material specification for hydro generators field poles, assuring a minimal quality for the tenders of the bid process.

Published in:

Transmission and Distribution: Latin America Conference and Exposition (T&D-LA), 2012 Sixth IEEE/PES