By Topic

The study on the short-term scheduling model and solutions of step power plants

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Yue Qin ; Coll. of Electr. & Electron. Eng, Huazhong Univ. of Sci. & Technol., Wuhan, China ; Cheng Shijie

This paper analyses the problem of short-term scheduling of the step power plants. In the paper, optimized short-term scheduling models which take the water balance, the energy balance, the delay of water (hydraulic network), the physical properties of hydroelectric station and the capacity of reservoir into consideration is proposed. Also, the application scope and the extension method for the proposed models are presented.

Published in:

Power Engineering and Automation Conference (PEAM), 2011 IEEE  (Volume:3 )

Date of Conference:

8-9 Sept. 2011