By Topic

A new 500MW back - to - back station to provide power exchange between Uruguay and Brazil

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$33 $33
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

6 Author(s)

The transmission system operator in Uruguay (UTE) has contracted ALSTOM Grid to build a 500MW inter-connector with Brazil. As the 500kV transmission system in Uruguay operates at 50Hz and the Brazilian 525kV transmission system operates at 60Hz, HVDC becomes the most appropriate technology to inter-connect the two grids. This paper provides details of the design of the new 500MW HVDC back to back inter-connector which will be located at the Melo sub-station. When constructed, the interconnector will alleviate short term generation issues, by providing a strategic link to the large Brazilian energy market.

Published in:

AC and DC Power Transmission, 2010. ACDC. 9th IET International Conference on

Date of Conference:

19-21 Oct. 2010