Scheduled System Maintenance:
On May 6th, system maintenance will take place from 8:00 AM - 12:00 PM ET (12:00 - 16:00 UTC). During this time, there may be intermittent impact on performance. We apologize for the inconvenience.
By Topic

Automated parameter derivation for power plant models based on staged tests

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

The purchase and pricing options are temporarily unavailable. Please try again later.
1 Author(s)
Pourbeik, P. ; EPRI, Knoxville, TN

This paper describes an approach for automated parameter derivation of models for synchronous generators, their excitation system and the turbine-governor. The methodology is based on performing and collecting data from a series of staged tests (mainly off-line). This data is then used in an automated routine to fit parameters to selected standard model structures. The results of this work have provided some quite significant insight into the process, strengths and weaknesses of field testing and generator model validation.

Published in:

Power Systems Conference and Exposition, 2009. PSCE '09. IEEE/PES

Date of Conference:

15-18 March 2009