Scheduled System Maintenance on May 29th, 2015:
IEEE Xplore will be upgraded between 11:00 AM and 10:00 PM EDT. During this time there may be intermittent impact on performance. We apologize for any inconvenience.
By Topic

Feasible Strategy for Allocating Cost of Primary Frequency Regulation

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Chu, W.-C. ; Dept. of Electr. Eng., Tatung Univ., Taipei ; Yi-Ping Chen

Among the ancillary services, a great number of cost allocation strategies have been broadly developed in the deregulated environment. Generally, the utilization of such services can be determined by directly evaluating the actual amount of the usage or by indirectly analyzing the fair/reasonable contribution/attribution to the market participants. In the case of the primary frequency regulation (PFR) service, which is operated by the participating generating units to maintain the real-time balance between the generation and load, the discussion of the PFR service attributed to the load side has still received relatively little attention. In this paper, a new strategy of the cost allocation of the PFR service from the customer side is proposed. Two main factors, the load fluctuation and the frequent demand change, are considered to figure out the PFR reaction relating to the different substations. The design of a scheme for determining the cost allocation index of the PFR service can be applied to the presently exiting power market. In addition, the actually load series recorded from the extra-high voltage (EHV) substations of the Taipower system located in northern, central, and southern Taiwan are meticulously analyzed and utilized to verify the feasibility and practicability of cost allocation.

Published in:

Power Systems, IEEE Transactions on  (Volume:24 ,  Issue: 2 )