This paper presents a unified method for optimal real and reactive power dispatch for the economic operation of power systems. As in other methods, the problem is decomposed into a P-optimization module and a Q-optimization module, but in this method both modules use the same generation cost objective function. The control variables are generator real power outputs for the real power module; and generator reactive power outputs, shunt capacitors/reactors, and transformer tap settings for the reactive power module. The constraints are the operating limits of the control variables, power line flows, and bus voltages.
Published in:
Power Apparatus and Systems, IEEE Transactions on
(Volume:PAS-104
,
Issue:
5
)
Date of Publication: May 1985