Scheduled System Maintenance:
Some services will be unavailable Sunday, March 29th through Monday, March 30th. We apologize for the inconvenience.
By Topic

Multi area state estimation using synchronized phasor measurements

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

The purchase and pricing options are temporarily unavailable. Please try again later.
2 Author(s)
Miang Zhao ; Dept. of Electr. Eng., Texas A&M Univ., College Station, TX, USA ; Abur, A.

This paper investigates the problem of state estimation in very large power systems, which may contain several control areas. An estimation approach which coordinates locally obtained decentralized estimates while improving bad data processing capability at the area boundaries is presented. Each area is held responsible for maintaining a sufficiently redundant measurement set to allow bad data processing among its internal measurements. It is assumed that synchronized phasor measurements from different area buses are available in addition to the conventional measurements provided by the substation remote terminal units. The estimator is implemented and tested using different measurement configurations for the IEEE 118-bus test system and the 4520-bus ERCOT system.

Published in:

Power Systems, IEEE Transactions on  (Volume:20 ,  Issue: 2 )