By Topic

Dynamic runtime re-scheduling allowing multiple implementations of a task for platform-based designs

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

3 Author(s)
Tin-Man Lee ; Princeton Univ., NJ, USA ; Henkel, J. ; Wolf, W.

This paper introduces an extension to the RMS scheduling technique that we call "hot swapping". Hot swapping enables a system to choose between various selected implementations of one task on-the-fly and thus to optimize the system's cost (e.g. power savings). The on-the-fly swapping between those implementations requires extra time to save and/or transform states of a certain task implementation. Even if the two steady-state schedules before and after the swapping are feasible, the transient schedule with the additional swapping computation time may exceed the system's capacity. Our technique is an extension to rate monotonic scheduling (RMS). While maintaining and meeting performance requirements, our technique shows an average reduction of 31% in power consumption compared to systems using a pure static scheduling approach (RMS) that cannot make use of task swapping. We have evaluated our algorithm through simulation of five real-world task sets and in addition by use of a large number of generated task sets

Published in:

Design, Automation and Test in Europe Conference and Exhibition, 2002. Proceedings

Date of Conference:

2002