By Topic

Two approaches to determine appropriated fab manufacturing production plan by cycle-time and WIP energy

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

3 Author(s)
Ko Chen Pin ; Manuf. Dept., Syst. on Silicon Manuf. Co. Pte. Ltd., Singapore ; Lee Yen Fei ; Ang Chee Teck

The paper presents two approaches to determine the foundry fab manufacturing production plan. The two approaches are namely, the Cycle Time Oriented (CTO) method the WIP Energy Oriented (WEO) method. The objective of CTO method is to derive a model with the consideration in the aspects of the master production plan (MPP) and cycle time (CT). On the other hand, the WEO model explores the consideration of the WIP balancing and linear wafer out (or planned wafer out) to determine the amount of stage-moves demand. The concepts and models were built and applied over a period in SSMC and therefore, giving birth to a complete study for manufacturing production plan

Published in:

Semiconductor Manufacturing Symposium, 2001 IEEE International

Date of Conference:

2001