Special methods for the calculation of temporary overvoltages due to transformer saturation

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

3 Author(s)
Rioual, M. ; Electr. de France, Clamart, France ; Sicre, C. ; Driss, K.B.

Summary form only given as follows. During power restoration, the energization of a no load transformer can lead to high overvoltages, the amplitude being sensible to initial conditions. This document describes an approach based on the AUTO program, which is a complementary tool to EMTP, and may help the understanding of the behaviour of the electrical circuit. The case of a progressive energization of a transformer is described, with a progressive energization from the hydraulic power plant of Pied de Borne towards the thermal power plant of Tricastin. Tests have been performed by the Exploitation Department, with a progressive voltage rise, the network having a resonant frequency at 164 Hz, with a distortion of the voltage above 0.6 Un, and the presence of the third harmonic, the maximum being obtained after ten seconds. A single phase of the network has been used and equations of this network have been solved with the AUTO program, showing that the network can generate the third harmonic, depending also on the value of the flux in the network, the third harmonic being reached for a value of 0.65 kWh; it has also been validated by EMTP calculations. A time domain approach, with programs like EMTP is however necessary to calculate the maximum overvoltage in a three phase network, especially when the phase to phase insulation of the equipment is concerned. In the case of high overvoltages, palliative solutions can be suggested like synchronizing devices in circuit-breakers, circuit-breakers with resistances and zinc-oxide arresters

Published in:
Power Engineering Society Winter Meeting, 2001. IEEE  (Volume:2 )

Date of Conference: 2001

Need Help?


IEEE Advancing Technology for Humanity About IEEE Xplore | Contact | Help | Terms of Use | Nondiscrimination Policy | Site Map | Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest professional association for the advancement of technology.
© Copyright 2013 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.