By Topic

A model of fossil fueled plant with once-through boiler for power system frequency simulation studies

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

3 Author(s)
Inoue, T. ; Central Res. Inst. of Electr. Power Ind., Tokyo, Japan ; Taniguchi, H. ; Ikeguchi, Y.

Summary form only given as follows. A model of the fossil fuelled generating power plant with once through boiler for power system frequency simulation studies is presented. In the model, the plant control system is modeled to represent the fundamental response of the coordinated boiler-turbine control in the large-size supercritical plants under change in the system frequency. The model is based on a survey of configurations of the plant control systems used in the major units commercially operated in Japan. The values of the parameters in the model are described through the comparisons with plant responses in a field test and with simulation results from a detailed model of the plant manufacturer. Sample simulation results from the model is presented for demonstrating the fundamental response of the once-through plants under change in system frequency

Published in:

Power Engineering Society Summer Meeting, 2000. IEEE  (Volume:1 )

Date of Conference:

2000