By Topic

Reliability modeling for expansion-planning of electric-power plants

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

1 Author(s)
El-Sayed, M.A.H. ; Cairo Univ., Giza, Egypt

The author presents a simple analytic approach for solving the problem of expansion planning of electric power plants. The relationship between the long-range generation investment and the plant size is studied to determine generation capacity. The reliability level, as an important limiting factor of the expansion planning process, is discussed and the corresponding systems costs are determined based on the reliability specification. The stochastic behavior of each plant is represented using a six-state model. The reliability level of the generation system is evaluated using a recursive convolution of the weekly load duration curve with the stochastic availability of the generating units. Central to the reliability calculation is the selection of the unit size; the relationships between plant size and the corresponding investment and production cost are calculated for each expansion alternative. The techniques are also applied to a practical power system and a comparative study is used to select the optimal plant size

Published in:

Reliability, IEEE Transactions on  (Volume:40 ,  Issue: 3 )