By Topic

Multimedia training system for Ge He Yan Hydro-Power Plant

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

5 Author(s)
Liu Lianguang ; Dept. of Electr. Eng., North China Inst. of Electr. Power, China ; Zhang Jianhua ; Chen Xiqiang ; Zhou Qiong
more authors

The Multimedia training system for Ge He Yan Hydro-Power Plant is composed of 11 sub-modules, including operation simulation training, main equipment of structure and principle training, basic knowledge training, etc. In order to make the training more attractive and realistic, a double screen PC is adopted in the operation simulation training so that the contents in the left and right screens as well as the multimedia interface and the background supporting programs can operate in a coordinated way. This paper introduces the general structure, system function and program design method of the training system

Published in:

TENCON '98. 1998 IEEE Region 10 International Conference on Global Connectivity in Energy, Computer, Communication and Control  (Volume:2 )

Date of Conference: