By Topic

Long-term transmission and generation maintenance scheduling with network, fuel and emission constraints

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Marwali, M.K.C. ; Dept. of Electr. & Comput. Eng., Illinois Inst. of Technol., Chicago, IL, USA ; Shahidehpour, S.M.

An integrated long-term scheduler (LTS) for a GENCO with local transmission lines and numerous constraints is proposed. The proposed algorithm extends the Benders decomposition to include network, fuel and emission constraints into LTS. The local network is modeled as a probabilistic problem to include the effect of generation and transmission outages. The proposed algorithm will be used by GENCO planners and ISO for ATC calculations

Published in:

Power Systems, IEEE Transactions on  (Volume:14 ,  Issue: 3 )