Scheduled System Maintenance:
On Monday, April 27th, IEEE Xplore will undergo scheduled maintenance from 1:00 PM - 3:00 PM ET (17:00 - 19:00 UTC). No interruption in service is anticipated.
By Topic

Design and verification of a 24 kA calibration head for a DCCT test facility [LHC current control]

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

The purchase and pricing options are temporarily unavailable. Please try again later.
3 Author(s)
Fernqvist, G. ; CERN, Geneva, Switzerland ; Jorgensen, H.-E. ; Saab, A.

The Large Hadron Collider is CERN's next particle accelerator project, scheduled for commissioning in 2005. The project requires accurate current measurements above 10 kA. Calibration heads have been developed in collaboration with industry to work up to 24 kA with a relative measurement uncertainty of 10-6. This paper describes the design and verification of these heads

Published in:

Instrumentation and Measurement, IEEE Transactions on  (Volume:48 ,  Issue: 2 )