By Topic

Conceptual predesign bridging the gap between requirements and conceptual design

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Kop, C. ; Dept. of Appl. Inf. & Inf. Syst., Klagenfurt Univ., Austria ; Mayr, H.C.

To overcome the impedance mismatch between requirement analysis and conceptual design, we introduce an intermediate step between the two phases, called conceptual pre-design. A (semantic) model for that phase should allow for an easy collection of requirements as well as for an unproblematic transformation of the collected requirements into entries of a conceptual scheme. We present a model that has been developed along these postulates. Following the classical DATA-ID approach, this model uses a “glossary metaphor” for scheme representation. It's basic semantic notions are `thing type' and `connection type'

Published in:

Requirements Engineering, 1998. Proceedings. 1998 Third International Conference on

Date of Conference:

6-10 1998