Avoided cost and effects of voltage control by demand response in a distribution network with high integration of rooftop PV

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

4 Author(s)
Kawamura, K. ; Socio-Econ. Res. Center, Central Res. Inst. of Electr. Power Ind., Tokyo, Japan ; Kato, R. ; Bando, S. ; Takahashi, M.

The capacity of installed photovoltaic (PV) generation in Japan has been expanding rapidly due to the governmental subsidy and feed-in tariff programs and then it has reached to 3.62 million kW as of 2010. This rapid increase in PV installation drives utilities to problems on how to operate stably the electric power systems. Therefore, electric power companies have to invest heavily in the systems. Our concern is to consider the possibility of implementing a demand response (DR) program as an alternative measure to the conventional power supply investment. This paper shows new findings from our simulations of voltage control by DR in distribution systems with high integration of rooftop PV. By our simulations based on the realistic input data, we clarified the economical efficiency of implementing the DR program as an alternative measure to the conventional investment in power supply against the voltage rise problem in distribution systems with PV.