By Topic

A new transmission cost allocation method considering power flow duration time in Smart Grid

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$33 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

3 Author(s)
Xi Jia ; State Key Lab of Power Systems, Department of Electrical Engineering, Tsinghua University, Beijing 100084, China ; Qing Xia ; Qixin Chen

The efficiency of asset utilization is one of the core contents of Smart Grid. This paper proposes the line Power Flow Duration Curve (PFDC) as a tool in the process of transmission cost allocation. The impact of the power flow duration time on the transmission asset utilization can be taken into account effectively. An implementation mechanism is designed. The case studies based on the IEEE 30-bus and 118-bus system demonstrate that the transmission cost can be allocated much more reasonably by the proposed method.

Published in:

2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)

Date of Conference:

14-17 Oct. 2012