By Topic

Modified particle swarm optimisation with a novel initialisation for finding optimal solution to the transmission expansion planning problem

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $31
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

1 Author(s)
Murugan, P. ; Dept. of ECE, Arulmigu Kalasalingam Coll. of Eng., India

The transmission expansion planning (TEP) problem consists of determining when and where new circuits are needed and should be installed to serve the growing demand for electric power. TEP is a hard, large-scale, non-linear, mixed-integer and non-convex combinatorial problem. Finding the solution for the TEP problem is very difficult as the number of options to be analysed and compared increases exponentially with the size of the network. This study presents an application of the modified particle swarm optimisation technique, with a novel initialisation (population monitored for complementary magnitudes initialisation), for improved performance (in terms of success rate and convergence) to the highly complex TEP problem. Here, the DC model of the transmission network is considered. The success of the proposed methodology has been tested on the Garver 6-bus system, IEEE 24-bus system and Southern Brazilian 46-bus system and validated.

Published in:

Generation, Transmission & Distribution, IET  (Volume:6 ,  Issue: 11 )