System Maintenance:
There may be intermittent impact on performance while updates are in progress. We apologize for the inconvenience.
By Topic

What we must learn from 1995 the Great Kobe-Earthquake. Considerations on the distribution power poles

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

1 Author(s)
Kobayashi, M. ; Kogakuin Univ., Tokyo, Japan

The Great Kobe Earthquake destroyed numerous electric power facilities. Officials estimated the minimum total cost of the damage from this earthquake to be Y230 billion (US $2.3 billion). The quake halted the power supply to over one million users for 9,000 minutes. This long blackout resulted from heavy destruction to the distribution system, as the heavy shock of the quake forced numerous power poles to incline, sending line conductors to the ground below. Fortunately, safety systems adequately protected main facilities like electric power stations and substations from serious damage. Field observations focused on two areas: (1) location of heavy equipment on the power poles; and (2) reinforcement of the power poles after the quake. The results of this survey indicate that preventive adjustments and reinforcements are urgently needed to protect such power poles against future earthquakes

Published in: