Scheduled System Maintenance:
On May 6th, system maintenance will take place from 8:00 AM - 12:00 PM ET (12:00 - 16:00 UTC). During this time, there may be intermittent impact on performance. We apologize for the inconvenience.
By Topic

Superconducting power cables: Both technological push and demand pull are needed to spur progress in superconducting, supercooled cables

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

The purchase and pricing options are temporarily unavailable. Please try again later.
1 Author(s)
Kaplan, G. ; Spectrum, Dover, NJ, USA

Discusses the future development prospects for HV superconducting cables assessing what is needed to realise them.

Published in:

Spectrum, IEEE  (Volume:17 ,  Issue: 9 )