The new National Electrical Code: Its impact on risk assessment

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Guidry, P.E. ; Electr., Fluor Enterprises, Inc., Sugar Land, TX, USA ; Mehmood, W.

During the 2008 National Electrical Code (NEC) [1] cycle, Article 708, Critical Operations Power Systems (COPS), was introduced. As stated in the scope of Article 708, “the provisions of this article apply to the installation, operation, monitoring, control, and maintenance of the portions of the premises wiring system intended to supply, distribute, and control electricity to designated critical operations areas (DCOAs) in the event of disruption to elements of the normal system.” Refineries and some petrochemical facilities may be included in this scope because of the criticality of their continuous operation. The purpose of this article is to analyze the effects of the new requirements for hardened electrical systems on the design and engineering of these facilities. Key points include: 1) risk assessment of the system, 2) power distribution requirements, 3) power sources, and 4) documentation of the emergency operations plan, all based on NEC requirements [2] and the National Fire Protection Association (NFPA) 1600-2010 Standard on Disaster/Emergency Management and Business Continuity Programs [4].