By Topic

On-line monitoring of partial discharge in rotating machine windings and auxiliaries including the use of external sensors

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

8 Author(s)

An online partial discharge test which is suitable for rotating machine windings and metalclad switchgear is described. Sensors are placed on the grounded envelope of the high voltage apparatus with no contact to the high voltage terminals. The sensors are connected to a portable pulse height analyzer. A similar measuring system can be used on a continuous basis in those applications where there is perceived to be a need. Examples are included of measurements made in various locations in the USSR as well as at Northern States Power and Manitoba Hydro

Published in:

Electrical Electronics Insulation Conference and Electrical Manufacturing & Coil Winding Conference, 1993. Proceedings., Chicago '93 EEIC/ICWA Exposition

Date of Conference:

4-7 Oct 1993