Cart (Loading....) | Create Account
Close category search window
 

Manufacturing implementation of corona oxide silicon (COS) systems for diffusion furnace contamination monitoring

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

4 Author(s)
Cosway, R.G. ; MOS12 Die Manuf., Motorola Inc., Chandler, AZ, USA ; Catmull, K.B. ; Horner, G. ; Letherer, B.

Maximizing production utilization of manufacturing tools is of vital importance to the economic health of a wafer fabrication facility; however, preventative maintenance and qualification is important to maintain the highest quality product from these tools. This imposes contradictory constraints on the time allocated to preventative maintenance qualification activities. For diffusion furnaces, the standard procedure is to utilize high-frequency capacitance-voltage (CV) measurements to assess the overall cleanliness of the quartzware. This requires an oxide to be grown in the furnace on test wafers usually without the presence of product. Following this, additional processing of these wafers is necessary to generate a structure which can be probed (electrode deposition, doping, pattern, and etch) and some type of furnace cleaning cycle is run for each boat in the system. Depending upon the type of furnace, the total time that product cannot be run can amount to one day and, depending on the qualification cycle, this hit in manufacturing time can occur each week, every two weeks, or every month. Once the furnace returns to manufacturing for running production, an additional delay is encountered prior to learning the outcome of the CV results potentially resulting in material being run through the furnace out of specification. By utilizing a state-of-the-art Corona Oxide Semiconductor (COS) system for furnace qualifications, we have been able to cut our qualification time from 26.5 hours to 2.5 hours per week and have effectively increased our furnace capacity

Published in:

Advanced Semiconductor Manufacturing Conference and Workshop, 1997. IEEE/SEMI

Date of Conference:

10-12 Sep 1997

Need Help?


IEEE Advancing Technology for Humanity About IEEE Xplore | Contact | Help | Terms of Use | Nondiscrimination Policy | Site Map | Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest professional association for the advancement of technology.
© Copyright 2014 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.