By Topic

PC37.242/D10, Sep 2012  -  IEEE Draft Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMU) for Power System Protection and Control

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

The purchase and pricing options are temporarily unavailable. Please try again later.

The document provides guidance for synchronization, calibration, testing, and installation of Phasor Measurement Units (PMU) applied in power system protection and control. The following are addressed in this guide: (a) Considerations for the installation of PMU devices based on application requirements and typical bus configurations. (b) Techniques focusing on the overall accuracy and availability of the time synchronization system. (c) Test and calibration procedures for laboratory and field applications. (d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators (PDC).