By Topic

Tight Approximation for Scheduling Parallel Jobs on Identical Clusters

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

5 Author(s)

We consider the Multiple Cluster Scheduling Problem (MCSP), where the objective is to schedule n parallel rigid jobs on N identical clusters, minimizing the maximum completion time (makespan). MCSP is 2-inapproximable (unless P = NP), and several approximation algorithms have already been proposed. However, ratio 2 has only been reached by algorithms that use extremely costly and complex subroutines as ”black boxes” which are polynomial and yet impractical due to prohibitive constants. Our objective within this work is to determine a reasonable restriction of MCSP where the inapproximability lower bound could be tightened in almost linear time. Thus, we consider a restriction of MCSP where jobs do not require strictly more than half of the processors of a cluster, and we provide a 2-approximation running in O(log(nhmax)n(N + log(n))), where hmax is the processing time of the longest job. This approximation is the best possible, as this restriction (and even simpler ones) remains 2-inapproximable.

Published in:

Parallel and Distributed Processing Symposium Workshops & PhD Forum (IPDPSW), 2012 IEEE 26th International

Date of Conference:

21-25 May 2012