Scheduled System Maintenance:
On May 6th, system maintenance will take place from 8:00 AM - 12:00 PM ET (12:00 - 16:00 UTC). During this time, there may be intermittent impact on performance. We apologize for the inconvenience.
By Topic

Study on establishing the power grid advanced metering infrastructure by applying on-site working standard

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

The purchase and pricing options are temporarily unavailable. Please try again later.
8 Author(s)

This paper discusses the basic scheme for establishing advanced metering infrastructure (AMI) by applying a high-voltage electric energy on-site calibration apparatus. The apparatus can work as an on-site working standard for implementing on-site calibration or verification to kinds of meters, electric energy metering cabinet and electric energy device in AMI. Furthermore, this paper provides a technical mean for calculating parameters of power grid, such as transformer loss and wire loss, in accordance with the principle of energy conservation. 10kV high voltage on-site calibration apparatus had been developed successfully and has been running in the power grid, on-site test results can prove that the scheme is feasible. Establishing a complete AMI system is of great significance for building a strong smart grid.

Published in:

Systems and Informatics (ICSAI), 2012 International Conference on

Date of Conference:

19-20 May 2012