By Topic

Independent and clean electricity supply for a hospital in palestine controlled by fuzzy rules and time estimator

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Mushtaha, M. ; Dept. of Electr. Eng., Univ. Duisburg-Essen, Essen, Germany ; Krost, G.

Stand alone wind-Diesel power systems can be an attractive solution for the supply of remotely located consumers or the provision of enhanced energy independence particularly in the Near-East region. This paper presents a dynamic behavior of a hybrid power system containing a wind turbine induction generator and a Diesel generator set supplying electrical demands for the main hospital in Gaza-Strip - Palestine. In this regard, hydrogen path and accumulator bank are added as long term and short term storage devices - respectively - in order to balance power in the system. In this paper, a proper fuzzy logic algorithm followed by a time estimator is applied to intelligently manage the energy storage strategy depending on the battery-bank state of charge, the hydrogen tank pressure, the prospective wind speed and the excess power under a given load profile of the hospital. The simulation results have been obtained in Matlab-Simulink environment, using SimPowerSystems and Fuzzy Logic toolboxes.

Published in:

Intelligent System Application to Power Systems (ISAP), 2011 16th International Conference on

Date of Conference:

25-28 Sept. 2011