Following part 1, this paper describes the development and real-time testing of an adaptive autoreclosing scheme for a 132-kV system with high penetration of wind generation. Having previously established the real-time system model, this second part concentrates on the hardware and software tools used to build the relay development platform, the algorithm itself, and the testing of this algorithm. A results section documents tests of the neural-network-based algorithm and is shown to be 100% reliable. Further successful tests on a 400-kV system suggest that the algorithm is robust to other system configurations.
Published in:
Power Delivery, IEEE Transactions on
(Volume:27
,
Issue:
3
)
Date of Publication: July 2012