By Topic

The application of fuzzy technique to high slope economic analysis in hydropower project

Sign In

Cookies must be enabled to login.After enabling cookies , please use refresh or reload or ctrl+f5 on the browser for the login options.

Formats Non-Member Member
$31 $13
Learn how you can qualify for the best price for this item!
Become an IEEE Member or Subscribe to
IEEE Xplore for exclusive pricing!
close button

puzzle piece

IEEE membership options for an individual and IEEE Xplore subscriptions for an organization offer the most affordable access to essential journal articles, conference papers, standards, eBooks, and eLearning courses.

Learn more about:

IEEE membership

IEEE Xplore subscriptions

2 Author(s)
Yang Kun ; Key Lab. Min. Disaster Prevention & Control, SUST, Qingdao, China ; Ma Zhichao

Proceed from economy theory, this paper selects the best treatment method of slopes based on minimum investment principle. In economic analysis, the most important one is to find failure probability of slopes. Traditional calculation method doesn't consider the fuzziness of mechanical parameters. However, the fuzziness exists objectively. In this paper, fuzzy technique is introduced and failure probability is calculated using fuzzy point evaluation method for different slope excavation scheme. So, the results accord with the actual working mode better.

Published in:

Fuzzy Systems and Knowledge Discovery (FSKD), 2011 Eighth International Conference on  (Volume:2 )

Date of Conference:

26-28 July 2011